top of page

Current Projects

Salalah Free Zone - MEP Design & Consulting

 

MEP Complete design,  light ,sockets, emergency light ,MDB, SMDB, cable sections ,cables routes , Fire alarm,  HVAC System (VRF) , Plumping (water supply ,Drainage,fan coil,duct).

Sultan Qaboos University Hospital - Controller System

 

This included instrument specification, procurement and non-inline instrument installation. Scope included controls configuration for the HVAC communication over BACnet, with BMS  direct air handler unit (6 AHU's)

Majis Seawater Desalination Plant, Sohar Port, Oman( Sogex Co ) DCS& SCADA  System / The plant capacity is 20 MLD. -

SCF Graphic Page modification,Intake Booster Pumps Logic modification,RO Racks Logic modification,Process Water Tanks Level logic modification,Intake Booster Pumps Graphic Page modification,MF System Overview Graphic Page modification,MF Backwash Inlet Valve BFV (N)-0641 assigning to DCS along with PALL Support ,Sulfuric acid dosing system programming, new graphics.

FOLLOW US:

© 2014 by BUSINESS WORLDWIDE SOLUTIONS

  • s-facebook
bottom of page